|
ACCOR REQUIRED A FRESH LOOK WITH KERB APPEAL FOR THERE
NEW BUDGET HOTEL.
IN THE ABSENCE
OF THE NORMAL BRICK CLADDING, SELF COLOURED RENDER WAS APPLIED DIRECT TO
THE PREFAB UNITS. INEXPENSIVE METAL CLAD ROOFING WAS ALSO USED ALLOWING
THE BUILDING TO FIT IN WITH THE LIGHT INDUSTRIAL SURROUNDINGS.
ACCOR ARE
PRESENTLY CONSIDERING THIS PROJECT AS A PROTOTYPE DESIGN FOR THE NEW
ETAP RANGE.
|